Case:

Commercial Utlities Plant

Scope of work:

Power company needed to install a much larger fuel tank than what was already there. Due to the larger size and location they couldn't just replace current tank; they had to put in a designated loading zone.

Design:

As noted by the photos below, we designed a loading zone with correct grading, drainage, and concrete safety bollards.



Follow Us On Social Media